Tennessee issues no state journeyman or master plumber license. Its top plumbing credential is the contractor’s license, classification CMC-A — Plumbing and Gas Piping, held by a business entity and earned by its Qualifying Agent through two Prov examinations — a 100-question trade paper on the International Plumbing Code 2021 and a 50-question Business and Law paper — each published at 73% to pass. This guide works through that credential in the order a candidate actually meets it.
This program is part of the expanding PassProfessor catalog — join the notify list and we’ll email you when enrollment opens.
The credential at a glance
| Item | Verified position |
|---|---|
| Program | Tennessee Contractor’s License, Classification CMC-A — Plumbing and Gas Piping (Qualifying Agent examinations) |
| Regulator | Tennessee Board for Licensing Contractors (Department of Commerce & Insurance), under T.C.A. Title 62, Chapter 6 |
| Credential holder | The business entity — sole proprietorship, corporation, partnership, or LLC; the Qualifying Agent is the examined individual |
| Vendor | Prov, Inc., the Board’s trade exam provider since July 1, 2026; bulletin effective October 31, 2026 |
| Trade examination | CMC-A — Mechanical Plumbing: 100 questions / 300 minutes / open book |
| Business examination | Tennessee Contractor Business and Law: 50 questions / 150 minutes, required of all new contractor applicants |
| Tested edition | International Plumbing Code 2021; International Fuel Gas Code 2018 or 2021 permitted for fuel gas |
| Passing standard | 73% to pass — the only published form; no raw count is published |
| Fees, by layer | Prov: $53.00 per examination. Board: initial $250; renewal $200 per 2 years |
| Delivery | Computer-based at six Tennessee Prov centres, or remote via Examroom.ai; Board pre-approval required before scheduling |
| Practical | None — isometric analysis is a content block inside the written trade examination |
| Administrator note | PassProfessor is independent and is not affiliated with the Tennessee Board for Licensing Contractors |
The companion program page is at /tennessee-master-plumber-exam-prep/. This guide is the deeper document: it separates the layers Tennessee candidates most often merge — entity and individual, trade paper and business paper, CMC-A and the full CMC, tested code and adopted code, vendor fee and Board fee — and treats each on its own terms.
Reading the verified facts: five separations that decide this credential
Entity and individual. The license belongs to the business. The examination belongs to the Qualifying Agent. Almost every Tennessee error begins by collapsing those two into one person with one title.
Trade and business. Two examinations, two references, two sittings. Passing one says nothing about the other.
CMC-A and CMC. Two classifications, two 100-question papers, one shared plumbing block size of 20 questions in the full CMC — and a full plumbing paper in CMC-A. Section below.
Vendor and Board. Prov administers the examinations and charges the examination fee. The Board licenses, pre-approves, and charges the license fees. Money paid to one layer is not money paid to the other.
Current and former vendor eras. Prov has served as the Board’s trade exam provider since July 1, 2026, under a bulletin effective October 31, 2026. Material describing the examinations under the former vendor’s arrangements — different question counts, different times, different fees, older code editions — describes a superseded sitting, not this one. This guide keys everything to the Prov bulletin and the current Board layers, and flags the one place where the two eras still touch: the book transition that runs to the end of 2026.
Step zero: there is no Tennessee journeyman or master license to hold first
Candidates arriving from states with a journeyman-to-master ladder look for the Tennessee rungs and do not find them, because Tennessee did not build them. There is no statewide journeyman plumber license, no master plumber license, and no apprentice registration in the Tennessee state scheme. That is a verified structure, not a gap in this guide’s research.
What exists below the contractor tier is the Limited Licensed Plumber license — an individual license, covered in its own section below strictly as ladder context. What exists at the top is the contractor’s license. A plumber’s route to CMC-A therefore does not run through a state journeyman examination at all: it runs through experience or a qualifying degree, Board pre-approval, and the two examinations of the Qualifying Agent. Local municipality and county plumbing licenses survive alongside the state scheme, but they are local instruments; this guide states nothing about their titles, fees, or scopes, and a candidate’s local position must be confirmed locally.
The route, in order
Step one — form or identify the entity and its Qualifying Agent. The applicant is the business. Decide who the Qualifying Agent is, and confirm the relationship fits the published forms: owner or full-time employee with power of attorney for a sole proprietor; general partner or such an employee for a partnership; a stockholder of at least 20 percent or such an employee for a corporation; manager, member, or such an employee for an LLC.
Step two — check the experience gate. The Qualifying Agent’s route rests on 3 years’ experience as a plumber, or on an engineering degree in plumbing or a mechanical field.
Step three — obtain Board pre-approval. CMC and CMC-A applicants must be pre-approved by the Board before scheduling with Prov. Candidates who book first and seek approval second have the sequence backwards.
Step four — sit the trade examination. CMC-A — Mechanical Plumbing: 100 questions, 300 minutes, open book, computer-administered, on the references below.
Step five — sit the Business and Law examination. 50 questions, 150 minutes, required of every new contractor applicant.
Step six — meet the standard in each. 73% to pass, as published, in each examination.
Step seven — complete the license layer. Board initial fee $250; the entity’s monetary limit set from its financials; the tiered general liability minimums in place. Then hold the license on its 2-year renewal cycle at $200, with no continuing education requirement for this classification.
The CMC-A trade examination in depth
The trade paper is a substantial sitting: 100 questions in 300 minutes, open book — five hours in which the open book helps the candidate who already knows the material and merely slows the candidate who does not. Its tested plumbing code is the International Plumbing Code 2021, stated verbatim at the head of the Prov reference list. Fuel gas is handled as a split reference: the CMC-A list permits the International Fuel Gas Code 2018 or 2021. The remaining named reference is Mathematics for Plumbers and Pipefitters, 8th edition, and its presence is a signal in itself: this paper expects working calculation, not only code recall.
The published outline blocks that carry the most weight deserve memorisation before any other study decision is made:
- Drain, Waste, and Vent — 20 questions. The single largest block. Sizing, venting, traps, and the logic of the drainage system as a system dominate the paper’s centre of gravity.
- Isometrics — 18 questions. The second-largest block, and the one most often misdescribed. These are isometric analysis questions inside a written examination — interpreting isometric material and reasoning about the runs it depicts. The section below returns to this.
- Code Requirements — 10 questions. The code’s own administrative and general requirements as they apply to plumbing work.
- Fuel Gas Systems — 10 questions. Examined on the permitted fuel gas editions, inside the same classification that carries gas piping in its name.
- Water Supply — 10 questions. Supply sizing, distribution, and protection, at the same weight as code requirements and fuel gas.
Those five blocks account for 68 of the 100 questions. A study plan that distributes its hours evenly across every topic a plumber knows, rather than weighting drainage and isometrics as the bulletin weights them, is a plan written against a different examination.
Isometric analysis is not a practical
Tennessee’s examinations contain no practical component and no drawing-production component — a verified negative, stated plainly because so many plumbing states do have one. The candidate will not assemble pipe, will not be observed working, and will not be asked to produce an isometric drawing. What the candidate will do, 18 times in the trade paper, is analyse isometric material presented inside written, open-book questions. Preparation follows from the format: fluency in reading runs, fittings, slopes, and connections as depicted, and in applying drain, waste, and vent and water supply rules to what a drawing shows. That is a written skill, and it is fully rehearsable in written preparation — which is precisely why this guide distinguishes it from the hands-on practicals of other states, where no such statement could honestly be made.
The Business and Law examination in depth
The Tennessee Contractor Business and Law examination — 50 questions in 150 minutes — is required of all new contractor applicants, and CMC-A applicants are contractor applicants. Its reference is the NASCLA Contractors Guide to Business, Law and Project Management — Tennessee, 4th edition, 2024. Its passing standard is published in the same form as the trade paper’s: 73% to pass.
Treat this paper as what it is: the state’s test of whether the person qualifying a contracting business understands the frame that business will operate inside — how Tennessee licenses contractors, how the entity’s obligations run, and how the commercial side of licensed work is organised. Candidates with deep trade experience and no business study fail routes at exactly this point in many states, not because the material is harder, but because it was never studied as a separate paper with its own reference. In Tennessee the two-paper structure is explicit, the reference is named, and the standard is the same. Prepare for two examinations.
A reciprocity note belongs here, stated at exactly the width the sources support: where reciprocity applies, it operates as a trade-examination waiver only — the Business and Law examination is still required. This guide names no reciprocity states for plumbing, because none is keyable from the verified record.
The full CMC, distinguished in full
The full CMC — Mechanical Contracting license is the classification candidates confuse with CMC-A, and the confusion is expensive because the examinations differ in composition while resembling each other in shape. Both papers carry 100 questions in 300 minutes; both print 73% to pass. But in the full CMC paper, Plumbing is a block of 20 questions out of 100 — the remaining 80 questions examine the wider mechanical field beyond plumbing. In the CMC-A paper, plumbing and gas piping are the whole classification.
Three practical consequences follow. First, confirm the classification on the application before studying anything; the two papers reward different preparation. Second, do not let any preparation material silently absorb the full CMC’s other 80 questions into a CMC-A account — a CMC-A candidate’s hours belong on the published CMC-A outline. Third, do not import CMC-A specifics into the full CMC either: the verified experience gate stated in this guide is the CMC-A gate, and the sources state no separate year-count for the full CMC beyond the pre-approval requirement both classifications share.
Tested code and adopted code: two layers that happen to agree
Tennessee is a state where the tested edition and the adopted edition coincide, and the guide still records them separately, because the habit of separating them is what protects candidates in states where they do not. The tested layer: the Prov bulletin examines on the International Plumbing Code 2021. The adopted layer: the State Fire Marshal’s rule adopts the International Plumbing Code 2021 as the state minimum. Same edition, two different instruments — the bulletin governs the sitting and what may be brought into it; the rule governs the work.
Layered over both is the dated book transition. Reference books from the former vendor’s era remain usable only through December 31, 2026; from January 1, 2027, only Prov-listed books are permitted. Read that as what it is — a transition with a closing date, published to let candidates with existing books sit through the end of 2026 — not as a permanent dual-list arrangement. A candidate preparing now for a 2027 sitting should acquire and tab the Prov-listed books and treat any older book as a study copy at best.
Money, in its separate layers
Vendor layer. Prov charges $53.00 per examination. A Qualifying Agent sitting both required examinations pays that fee for each sitting, to Prov, at registration.
Board layer. The contractor initial fee is $250, and renewal is $200 per 2 years. Late renewal is keyed only in its published form: a penalty of 10 percent of the renewal fee per month, capped at twice the normal fee. This guide prints no freestanding late-fee dollar, because none is published in that form.
The monetary limit — the figure that sizes the license. A Tennessee contractor’s monetary limit is the lesser of 10 times net worth or 10 times working capital. At $300,000 in both, the license is unlimited. A 10 percent tolerance applies to the limit, and limits are never combined. The limit is not a formality: it states the size of work the entity’s license supports, and a Qualifying Agent should be able to compute it from a balance sheet without hesitation — the Business and Law side of this credential assumes exactly that fluency.
Insurance tiers. General liability minimums rise with the limit: $100,000 at limits of $500,000 or less; $500,000 at limits of $1.5 million or less; $1 million above $1.5 million.
Financial statement and bond alternative. The Board’s current financial requirements place the initial CPA threshold at $3,000,000. Since July 1, 2026, a surety-bond alternative of at least 50 percent of the requested limit is available in lieu of the financial statement. Candidates reading older rule prints will meet a lower CPA threshold figure in them; that figure is superseded for initial licensure and this guide does not present it as current.
One fee this guide deliberately does not print: a pre-approval fee dollar. Pre-approval itself is verified and required — the dollar was not read in any primary source, and a guide that prints unverified dollars teaches candidates to budget on fiction.
The Limited Licensed Plumber: ladder context, clearly labelled
Everything in this section is context for the Tennessee ladder, not part of the CMC-A route. The Limited Licensed Plumber is an individual license — the person, not an entity, holds it — for projects of less than $25,000 in total cost including materials and labor, with no splitting of a larger project into phases to fit under the line. Its holder is not a contractor and may not use the title “contractor.” Its examination carries 40 questions in 120 minutes at the same published form of standard, 73% to pass, and no Business and Law examination is required for it. Its experience gate is 1 year of plumbing experience under current law. No Board pre-approval is required before its scheduling. CMC-A and CMC license holders are exempt from it. Its renewal carries no continuing education requirement.
The Limited Licensed Plumber matters to a CMC-A candidate for one reason: the $25,000 line is the boundary of the contractor tier itself. Work at or above that total belongs to the licensed contractor; work below it is where the individual license operates. Understanding which side of the line a described job falls on is Tennessee licensing judgement in its purest form, and both the trade route and the business route assume it.
Losing a Qualifying Agent, retakes, and the sitting day
Qualifying Agent loss. Notify the Board within 10 days; a new Qualifying Agent must test and be appointed within 3 months, or the license becomes inactive. Put the deadline in the business’s own compliance calendar the day the license issues, not the day the agent resigns.
Retakes. Attempts are unlimited, with a 1-day wait after a failure. There is no retake after passing — a passed examination is done. This guide states no exam-score validity period, because the bulletin states none.
Results and rescheduling. Examinations are graded immediately, with results forwarded to the Board automatically. Reschedule or cancel free at least 3 days ahead; inside 3 days, the fee is forfeited.
Delivery. Computer-based testing at six Prov centres in Tennessee — Chattanooga, Greeneville, Knoxville, Memphis, Murfreesboro, and Nashville — or remote via Examroom.ai. All of these examinations are open book and computer-administered.
A study plan built on how Tennessee actually examines
First, weight by the bulletin. Drain, waste, and vent work and isometric analysis together are 38 of 100 trade questions. Build the plan around them, then code requirements, fuel gas, and water supply at their published 10-question weight, then the remainder of the outline.
Second, run Business and Law as a parallel track from week one. Its reference is a different book, its content is a different discipline, and its standard is the same 73% to pass. Candidates who start it after finishing trade study discover the route had two halves all along.
Third, practise isometric analysis as a reading skill. Timed sets of isometric material, worked against the drainage and supply rules, until interpreting a depicted run is faster than describing it. This is the closest thing Tennessee has to a performance component, and it is entirely trainable on paper.
Fourth, learn the license layer as examinable content. The $25,000 threshold, the monetary-limit computation, the insurance tiers, the Qualifying Agent replacement deadlines — these are the facts the credential runs on after the sitting, and the business side of the route tests the same cast of mind.
Fifth, sit under real conditions. Open book, timed, with the Prov-listed books — the books that will be permitted in the sitting, in the editions the sitting allows, with the January 1, 2027 book rule in view.
The errors this route is built to catch
Searching for a master plumber license. Tennessee does not issue one; time spent looking is time not spent on pre-approval. Studying the wrong vendor era — former-vendor question counts, times, fees, and code editions describe a superseded examination. Manufacturing a raw pass count from 73 percent: none is published, and pacing or judging a result by an invented count misreads the standard Tennessee actually prints. Booking before pre-approval. Preparing CMC-A material for the full CMC, or the reverse — 20 of 100 is not 100 of 100. Calling isometric analysis a practical and neglecting it as “not written work,” when it is 18 written questions. Ignoring the monetary limit until after licensure, when it determines the work the entity may take. And assuming continuing education must be accumulated for CMC-A renewal: Tennessee requires none for this credential, and hours gathered for a residential building classification do not belong to it.
Tennessee in one view
Tennessee in one view is a contractor’s state. It licenses businesses, examines the qualifying minds behind them, sets a dollar line at $25,000 below which an individual license operates, sizes each license by the lesser of two ten-times computations, and tests plumbing and business competence as two separate papers under one standard — 73% to pass. It has no journeyman rung, no master title, no practical examination, and no continuing education for this tier, and each of those absences is a verified feature of the design, not an omission in the record. The candidate who internalises that design — entity first, Qualifying Agent second, two examinations, one code edition, a dated book transition — is studying the credential Tennessee actually issues. The companion program page at /tennessee-master-plumber-exam-prep/ describes the PassProfessor program built on that design.
After the sittings: holding the license
The contractor license renews on a 2-year cycle at $200, with no continuing education attached to CMC-A renewal. The live obligations are structural rather than educational: keep a Qualifying Agent in place and replace one within the deadlines if they leave; keep the monetary limit in view as the entity’s financials and ambitions change; keep the tiered general liability coverage matched to the current limit; and respect the $25,000 boundary in both directions — contractor work at and above it, and no reaching below it to do Limited Licensed Plumber work in a contractor’s name without the exemption the classification actually carries. The license rewards the same quality the examinations test: knowing exactly which instrument authorises exactly which work.
Frequently asked questions
Why does this guide not describe a Tennessee master plumber examination?
Because Tennessee has none. There is no state master plumber license, no journeyman plumber license, and no apprentice registration. The top plumbing credential is the contractor’s license, classification CMC-A — Plumbing and Gas Piping.
How many examinations does the CMC-A route require?
Two for a new applicant: the CMC-A trade examination (100 questions, 300 minutes, open book) and the Tennessee Contractor Business and Law examination (50 questions, 150 minutes).
What is the passing standard, exactly as published?
73% to pass. No raw number of correct questions is published for these examinations, and this guide manufactures none.
What is the difference between CMC-A and the full CMC?
CMC-A is the plumbing and gas piping classification; its trade paper is the plumbing paper. The full CMC — Mechanical Contracting paper also runs 100 questions, but Plumbing is only 20 of them.
Which books may I use, and for how long?
The tested plumbing code is the International Plumbing Code 2021, with the International Fuel Gas Code 2018 or 2021 permitted for fuel gas. Books from the former vendor’s era remain usable only through December 31, 2026; from January 1, 2027, only Prov-listed books are permitted.
Do I need Board approval before booking?
Yes. CMC and CMC-A applicants require Board pre-approval before scheduling with Prov.
Is any part of the examination hands-on?
No. There is no practical and no drawing-production component. Isometric analysis — 18 of the trade paper’s 100 questions — is analysis inside the written, open-book examination.
What happens if our Qualifying Agent leaves?
Notify the Board within 10 days. A new Qualifying Agent must test and be appointed within 3 months, or the license becomes inactive.
How is the monetary limit calculated?
The lesser of 10 times net worth or 10 times working capital; unlimited at $300,000 in both; a 10 percent tolerance applies and limits are never combined.
What does it cost, layer by layer?
Prov charges $53.00 per examination. The Board’s contractor initial fee is $250 and renewal is $200 per 2 years. The vendor fee and the Board fees are separate charges to separate layers.
If I fail, how soon can I sit again?
Attempts are unlimited, with a 1-day wait after a failure. There is no retake after passing. Rescheduling is free at least 3 days ahead.
Does CMC-A renewal require continuing education?
No. Tennessee imposes no continuing education requirement on CMC-A or CMC renewal.
Is PassProfessor affiliated with the Board or Prov?
No. PassProfessor is an independent preparation provider. The Board alone licenses, and Prov administers the examinations.
When does enrollment open for the PassProfessor program?
The program is in the works and enrollment is not yet open. Leave an email address on this page and PassProfessor will write to you when the program is ready — and only about this program.