CCO Concrete Pump Operator – Practice Exams
About This Program
This program prepares candidates for the CCO Concrete Pump Operator (CPO) written examination, administered by CCO (the National Commission for the Certification of Crane Operators, NCCCO). The CPO certification covers operators of truck-mounted concrete boom pumps and placing booms – pumping concrete through a boom pipeline and end hose to the point of placement. The written examination is one sitting of 80 multiple-choice questions in 90 minutes, with a calculator permitted, built on the published knowledge areas in the CCO Concrete Pump Operator Candidate Handbook: pre-trip planning, driving the truck, setting up the pump, placement operations, preparing the pump for travel, and end-of-day procedures. Certification also requires a CCO practical examination on a Class 1 (28m to 36m boom) or Class 2 (37m to 49m boom) concrete pump; this program prepares for the written examination only, and it does not cover the practical examination. CCO publishes no percentage passing standard for this written examination in the handbook, so the practice benchmark used in this program is a study target only. This is the CCO Concrete Pump Operator designation – a different credential from every crane, drill-rig, pile-driver, and digger-derrick designation in the CCO suite, and from the pool and spa operator credential that shares the CPO initials. PassProfessor is independent and not affiliated with CCO (NCCCO), and this product is examination preparation only.
What Is Covered
- A. Pre-Trip Planning (228 questions): selecting the day’s materials and PPE, personal and environmental readiness, truck precheck inspection (DVIR), and pump precheck inspection.
- B. Driving the Truck (138 questions): driving the pump truck to the job, defensive driving and distraction avoidance, driving laws, permits and road restrictions, and hours of service, logbook and driver qualification.
- C. Set Up Pump (510 questions): consulting the pour supervisor and hazard review, verifying site information, positioning the pump, outrigger pads, dunnage and ground support, extending outriggers, short rigging and leveling, unfolding the boom, pre-pour component inspection, installing boom attachments and added line, priming the pump, and air entrapment, hose handling and surge safety at setup.
- D. Placement Operations (372 questions): guiding concrete trucks, mix design, batch time and pumpability, communication with the placement crew, boom and end-hose placement control, system and line pours, monitoring the pour, blockages and safe clearing, restart after a stoppage, and maintenance needs and spills during the pour.
- E. Prepare Pump for Travel (150 questions): cleanout methods and tools, shutdown procedure and verifying the system is clean, and preparing for the trip back.
- F. End-of-Day Procedures (102 questions): offsite cleanout and environmental rules, post-trip documentation and reporting repairs, washing, refueling and preparing for the next day, and preventative maintenance and end-of-day paperwork.
How It Works
The bank contains 1,500 original practice questions written to the six published CCO knowledge areas, each with a full explanation. Practice questions are original items; they are not CCO exam questions. A full practice exam mirrors the real written sitting at 80 questions in 90 minutes, drawn across the six areas in proportion to the bank. Practice exams are scored against a 70% PassProfessor practice benchmark – a practice benchmark only, not a CCO passing standard, because CCO publishes no percentage passing standard for this examination. Eligibility note: CCO requires candidates to be at least 18, comply with the CCO Substance Abuse Policy, and agree to the CCO Code of Ethics; the written and practical elements must be passed within 12 months of each other, and certification runs five years.
Full access: $49 for 6 months. Start with the free 20-question sample.
