CWI Practice Test: 12 Worked Questions Across Parts A, B and C

Not sure where your CWI preparation stands? These twelve diagnostic questions sample the certification the way AWS builds it — three separate examinations, drawn here at the same shape as our 1,500-question bank: six Part A (Fundamentals) questions, three Part B (Practical) questions, and three Part C (Code Book Applications) questions. Work each question before reading its answer — the pattern of what you miss, part by part, is the diagnostic.

THE PROGRAM IN NUMBERS
Fresh
FULL-LENGTH PRACTICE EXAMS
Drawn new for every attempt from the full question bank
Quick
QUICK PRACTICE
Short mini-quiz drills inside the course
20
FREE SAMPLE QUESTIONS
Try the program before you buy
6 months
OF ACCESS
Full access from the day you enroll

AWS publishes the passing standard in its own words: “Candidates must achieve a minimum score of 72% on each exam part to obtain the CWI credential.” There is no averaging across parts — each part is passed on its own line.

Part A – Fundamentals

1. Two plates are placed edge to edge in roughly the same plane so a weld can join them along their adjoining edges. What is this arrangement called?

A. A lap joint

B. A butt joint

C. A corner joint

D. An edge joint

Correct: B. A butt joint joins two members lying in approximately the same plane along their edges. Lap, corner, and edge joints describe different member orientations.

2. A welder uses a hand-held clamp holding a flux-covered rod, striking an arc between the rod tip and the work; the rod melts to form the weld. This process is:

A. Shielded metal arc welding

B. Gas tungsten arc welding

C. Submerged arc welding

D. Electroslag welding

Correct: A. Shielded metal arc welding uses a consumable covered electrode held in a manual holder, with the coating supplying shielding and slag. The tungsten process uses a nonconsumable electrode instead.

3. A welding symbol has a horizontal reference line with an arrow at one end pointing to a T-joint. A right triangle representing a fillet weld is drawn below the reference line. On which side of the joint must the fillet be placed?

A. On the side opposite the arrow

B. On both sides regardless of the symbol

C. On the arrow side of the joint

D. Only in the field, wherever access is best

Correct: C. A weld symbol placed below the reference line calls for the weld on the arrow side of the joint, while a symbol above the line calls for the other side. The arrow itself points to the joint being referenced.

4. An inspector arrives before any arc is struck on a butt joint and checks joint fit-up, edge preparation, root opening, and material identity against the drawing. Which inspection stage is being performed?

A. Final inspection after welding

B. In-process inspection during welding

C. Repair inspection after excavation

D. Inspection prior to welding

Correct: D. Checking materials, preparation, and fit-up before welding starts is the prior-to-welding stage. Catching errors here prevents defects that later stages cannot undo.

5. A welder qualifies on a plate groove test in the 1G position. How was the plate positioned and the weld deposited?

A. Plate flat, weld deposited from above in the flat position

B. Plate vertical, weld progressing upward

C. Plate horizontal, weld on a vertical surface progressing horizontally

D. Plate overhead, weld deposited from below

Correct: A. In the flat groove position the plate lies flat and welding is done from the upper side. Vertical, horizontal, and overhead descriptions match the other numbered positions.

6. A minimum preheat of 225 degrees Fahrenheit must be verified with a Celsius instrument. Using Celsius = (Fahrenheit − 32) × 5 ÷ 9, what is the temperature in Celsius, rounded to the nearest degree?

A. 437 degrees Celsius

B. 107 degrees Celsius

C. 125 degrees Celsius

D. 193 degrees Celsius

Correct: B. Celsius = (225 − 32) × 5 ÷ 9 = 193 × 5 ÷ 9 = 107.2, which rounds to 107 degrees Celsius. Skipping the subtraction of 32 gives the 125-degree distractor.

Part B – Practical

Part B questions here state every specimen reading and acceptance limit in the text; the real Part B is hands-on, worked on physical replicas with a physical tool kit.

7. On a fillet-welded T-joint, undercut at the toe measures 3/64 in. deep over a 2 in. length. The specification allows undercut no deeper than 1/32 in. What is the correct disposition?

A. Accept as-is because the affected length is short

B. Accept if the weld leg size is full

C. Reject and repair by blending or adding weld metal as directed

D. Accept after wire-brushing the toe smooth

Correct: C. The measured depth of 3/64 in. exceeds the stated 1/32 in. limit, so length and leg size do not make it acceptable. It must be repaired rather than merely cleaned.

8. A fillet required to be 1/4 in. measures 5/16 in. on both legs with a smooth profile and no other flaws. The specification sets a minimum fillet size and no maximum for this joint. What is the disposition?

A. Reject for exceeding the drawing size

B. Require grinding down to exactly 1/4 in.

C. Reject because oversize always means excess heat input

D. Accept, because the weld meets the minimum size and no maximum applies

Correct: D. With only a minimum size stated and no maximum, a 5/16 in. fillet over a 1/4 in. requirement is acceptable when profile and other criteria pass. Grinding to exact size is not required by the stated rule.

9. A welder qualified with SMAW on 3/8-in. plate in the 3G position. The governing sample specification states that a 3/8-in. test plate qualifies the welder for base-metal thickness from 3/16 in. through 3/4 in. in the positions earned. The welder is assigned a 1/2-in. plate groove weld in the vertical position. Is the welder qualified for this assignment?

A. Yes, because 1/2 in. falls inside the stated 3/16 in. through 3/4 in. range and the position was earned

B. No, because a test plate qualifies only the exact thickness that was welded

C. No, because vertical groove work requires a separate pipe test

D. Yes, but only if the production weld is made with a backing strip

Correct: A. The production thickness of 1/2 in. lies within the stated qualified range of 3/16 through 3/4 in., and vertical is the position the 3G test earned. Qualification covers a stated range, not just the single test thickness.

Part C – Code Book Applications

Each Part C question names the code that governs it in the question itself, exactly as the bank keys it — a rule from one code is never presented as a rule for all codes.

10. Under AWS D1.1 structural welding rules, a welding procedure was qualified with the shielded metal arc welding process. Production now proposes to use gas metal arc welding with the same joint and base metal. What is required?

A. Nothing, because any arc process may be substituted freely

B. Only a revised shop drawing is required

C. The welder alone must requalify, with no procedure action

D. A new procedure qualification is required because the welding process changed

Correct: D. A change in welding process is an essential variable for procedure qualification, so the existing qualification does not cover the new process. A new procedure qualification record supporting a new specification is needed.

11. Under ASME BPVC Section IX rules, a procedure qualification record documents a test coupon welded at 1/2 in. thickness, and the qualified thickness range stated for this item is 3/16 in. to 1 in. A welding procedure specification proposes production base metal at 1-1/4 in. What is the correct conclusion?

A. The procedure is qualified because thickness has no upper limit

B. The procedure is not qualified for 1-1/4 in. because that thickness is outside the stated range

C. The procedure is qualified if the welder is experienced

D. The procedure is qualified if preheat is increased

Correct: B. Production thickness must fall within the range qualified by the test coupon as stated in the stem. A thickness of 1-1/4 in. exceeds the stated 1 in. maximum, so it is not covered.

12. Under API 1104 pipeline welding rules, a qualified procedure used one filler-metal group, and production proposes a filler metal from a different group with different strength characteristics. The process, position, and wall thickness are unchanged. What action is required?

A. Continue welding and note the change on the daily report only

B. Increase travel speed to compensate for the new filler

C. Have the inspector approve the substitution verbally

D. Requalify the procedure because the filler-metal group changed

Correct: D. Filler-metal group is treated as an essential variable in pipeline procedure qualification. Changing to a different group therefore requires requalification, even when other variables stay the same.

Keep going: the full program — 1,500 original questions across all 21 B5.1 content areas, 21 area drills and a full timed Part A simulation — is the AWS Certified Welding Inspector (CWI) Exam Prep course. Read the AWS CWI exam guide for the format, eligibility and passing standard in full, try the free 20-question sample, or enroll for $79 with 6 months of access.

Disclaimer

PassProfessor is an independent exam-preparation provider. This program is exam preparation only: it is not the real exam, it provides no education credit, and completing it does not by itself qualify you for any license or certification. The real exam is run by its own exam body — you register for it, pay its fees, and sit it through that body, not through PassProfessor. All practice questions in this program are original; they are not actual exam questions.